Research on Quality Assurance Classification of Nuclear Power Conventional Island and
BOP Construction Phase
高照普 GAO Zhao-pu
(山东电力工程咨询院有限公司,济南 250000)
(Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,Ji'nan 250000,China)
摘要:CAP1400核电工程是在第三代先进核电AP1000非能动技术的基础上,通过再创新开发出先进压水堆核电机组。文章阐述了CAP1400核电常规岛及BOP工程建造阶段质保分级管理的意义和原则,通过分析不同的质量保证要求,采取差异化的质量管理控制措施,在满足质保要求的前提下节约建造成本,为今后常规岛及BOP质保分级提供参考。
Abstract: The CAP1400 nuclear power project is an advanced pressurized water reactor nuclear power unit developed through re-innovation on the basis of the third-generation advanced nuclear power AP1000 passive technology. The article elaborates the significance and principles of quality assurance classification management during the construction phase of CAP1400 nuclear power conventional island and BOP project. By analyzing different quality assurance requirements and adopting differentiated quality management control measures, the construction cost can be saved on the premise of meeting the quality assurance requirements. Provide reference for conventional island and BOP quality assurance classification.
关键词:CAP1400核电;质保分级 ;物项和服务;建造阶段
Key words: CAP1400 nuclear power;quality assurance classification;items and services;construction phase
中图分类号:TM623.9 文献标识码:A 文章编号:1006-4311(2021)26-010-03
doi:10.3969/j.issn.1006-4311.2021.26.004
文章出处:高照普. 核电常规岛及BOP建造阶段质保分级研究[J]. 价值工程,2021,40(26):10-12. |