Analysis of Key Factors and Control Methods in Transmission Line Design
谭文韬 TAN Wen-tao
(苏州电力设计研究院有限公司,苏州 215011)
(Suzhou Electric Power Design Institute Co.,Ltd.,Suzhou 215011,China)
摘要: 随着经济社会的快速发展,电网投资的规模和数量也在不断增加,输电线路工程作为电网投资的一类重点项目,其方案设计的合理性直接关系到工程项目的质量、进度和投资效益等各个方面。传统的输电线路项目在设计过程中侧重于考虑单一或少量因素,无法全面和准确的反应输电线路项目对设计方案选择时的多样化需求。因此,在进行输电线路项目设计过程中需要综合考量影响设计方案制定和选择的多类型因素,并针对不同因素实施具有针对性的管控措施,从而实现输电线路设计方案的最优化。
Abstract: With the rapid development of economy and society, the scale and quantity of power grid investment are also increasing. As a kind of key project of power grid investment, the rationality of transmission line project scheme design is directly related to the quality, progress and investment benefit of the project. Traditional transmission line projects focus on considering a single or a small number of factors in the design process, which can not fully and accurately reflect the diversified needs of transmission line projects for design scheme selection. Therefore, in the process of transmission line project design, it is necessary to comprehensively consider multiple types of factors affecting the formulation and selection of design scheme, and implement targeted control measures for different factors, so as to realize the optimization of transmission line design scheme.
关键词: 输电线路设计;关键影响因素;管控方式
Key words: transmission line design;key influencing factors;control method
中图分类号:TM73 文献标识码:A 文章编号:1006-4311(2022)21-020-03
DOI:10.3969/j.issn.1006-4311.2022.21.006.
文章出处:谭文韬. 输电线路设计过程中的关键因素及其管控方式分析[J]. 价值工程,2022,41(21):20-22.
|