主页 关于我们 最新公告 往期目录 录用通知 投稿指南 汇款方式 联系我们 推荐阅读
最新公告
《价值工程》现安排25年8-10月版面!可以加急2412-30
2024年中国科技核心期刊目录09-20
《价值工程》投稿咨询电话!08-22
《价值工程》对文章题目和摘要的字数要求08-15
《价值工程》栏目设置07-22
《价值工程》文章细节要求:05-15

版权信息

版权信息:
杂志名称:《价值工程》
主管单位:河北省科学技术协会
主办单位:河北省技术经济管理现代化研究会
国际刊号:1006-4311
国内刊号:13-1085/N
邮发代号:18-2
责任编辑:张崇
咨询电话:18132119945
投稿邮箱:vezzs02@163.com

价值链·供应链
弧形索塔施工过程风荷载静力效应分析

Analysis on Static Effect of Wind Load during Construction of Arc Cable Tower
聂宁波 NIE Ning-bo;牛俊杰 NI Jun-jie;钟一帆 ZHONG Yi-fan;李龙 LI Long
中铁十五局集团第一工程有限公司,西安 710000)
(China Railway 15th Bureau Group 1st Corporation Ltd.,Xi'an 710000,China)

摘要: 弧形索塔造型美观,常应用于独塔斜拉桥中,但索塔施工过程受力复杂,线形控制难度大,受风荷载、温度荷载等因素影响大。本文以某拱门型索塔斜拉桥为工程背景,探究索塔施工过程中风荷载对索塔结构的静力效应及梁柱效应。利用MIDAS有限元软件,建立力学模型,对有无风荷载在索塔施工过程中对结构应力、位移的影响,并运用P-Δ分析控制。计算表明,主动横撑位置处首先出现拉应力且逐渐增至最大,横向静风荷载作用下相比无风荷载作用,最大拉应力增加了35.80%,成塔后位移增大了95.98%。考虑梁柱效应后,索塔的内力和位移的变化量很小。结果表明,静风荷载对索塔施工阶段内力及位移影响很大,风荷载作用下梁柱效应对混凝土索塔的影响可忽略不计。
Abstract: The curved cable tower has a beautiful shape and is often used in single-tower cable-stayed bridges. However, it is difficult to control the alignment due to complicated forces during the construction of the cable tower and is greatly affected by wind load and temperature load.This paper takes an arched Cable-tower cable-stayed bridge as engineering background to explore the static effect of wind load on Cable-tower structure and beam-column effect during Cable-tower construction. By using MIDAS finite element software, the mechanical model is established, and the effect on structural stress and displacement under wind load and construction load is controlled by P-Δanalysis. The calculation shows that the tensile stress first appears at the active transverse brace position and gradually increases to the maximum. Under the transverse static wind load, the maximum tensile stress increases by 35.80% and the displacement increases by 95.98% compared with the non-wind load.Considering beam-column effect, the variation of internal force and displacement of cable tower is very small. The results show that the static wind load has a great influence on the internal force and displacement during the construction stage of the cable tower, and the beam-column effect under the wind load has a negligible influence on the concrete cable tower.
关键词: 索塔施工;液压爬模;风荷载;梁柱效应
Key words: cable tower construction;hydraulic climbing formwork;wind load;beam column effect
中图分类号:U443.38    文献标识码:A      文章编号:1006-4311(2022)21-063-03


        DOI:10.3969/j.issn.1006-4311.2022.21.019.

        文章出处:聂宁波,牛俊杰,钟一帆,等. 弧形索塔施工过程风荷载静力效应分析[J]. 价值工程,2022,41(21):63-65.


社址:石家庄市槐安西路88号卓达玫瑰园物业楼 050091    电话:18132119945    微信:15132496582

投稿邮箱:vezzs02@163.com

价值工程杂志社

点击这里给我发消息      点击这里给我发消息

备案号:冀ICP备19020820号-1     技术支持:新钥匙建站

我要啦免费统计
点击这里给我发消息
点击这里给我发消息
24小时热线: 18132119945