Research on 110kV Power Corridor Engineering Construction of Miquan Traction Station
闫春杰 YAN Chun-jie
(乌鲁木齐地下综合管廊投资管理有限公司,乌鲁木齐 830000)
(Urumqi Underground Integrated Pipe Gallery Investment Management Co.,Ltd.,Urumqi 830000,China)
摘要: 本文以米泉牵引站110kV电力廊道工程建设方案为例,简述了电力管廊建设的必要性、技术可行性及相关实施方案,为开展相关工作的研究人员提供一些借鉴。
Abstract: This paper takes the construction plan of the 110kV power corridor project of the Miquan traction station as an example, briefly describes the necessity, technical feasibility and related implementation plans of the construction of the power pipe gallery, and provides some references for researchers who carry out related work.
关键词: 电力管廊;建设必要性;地下管网;廊道敷设
Key words: electric power pipe gallery;construction necessity;underground pipe network;corridor laying
中图分类号:TU9 文献标识码:A 文章编号:1006-4311(2022)22-023-04
DOI:10.3969/j.issn.1006-4311.2022.22.008.
文章出处:闫春杰. 米泉牵引站110kV电力廊道工程建设研究[J]. 价值工程,2022,41(22):23-26.
|