Construction Technology Analysis of Longitudinal Ribbed Laminated Precast Shear Wall
金石JIN Shi;范志伟FAN Zhi-wei
(北京城建集团有限责任公司,北京100086]
(Beijing Urban Construction Group Co.,Ltd., Beijing 100086, China
摘要;目前,在全面实施绿色建筑的情况下,装配式结构在住宅项目中广泛应用,装配式剪力墙原来应用较多的是套筒灌浆工艺存在钢筋连接复杂,灌浆作业过程质量难以监控的问题。相比较来说,采用新型纵肋叠合剪力墙,钢筋连接简易、质量易控,采用自密实混凝土灌注质量保证率高。本论文针对纵肋叠合剪力墙施工全过程要点进行总结、归纳。
Abstract: At present, with the full inplementation of green buildings, prefabricated structures are widely used in residential projects.The prefabricated shear wall was originally used mostly in sleeve grouting technology, which has the problem of complex reinforcementconnection and difficult to monitor the quality of grouting operation. In comparison, the new type of longitudinal rb composite shear wall isadopted, which makes the connection of reinforcement simple and the quality easy to control, and the self compacting concrete grouting hasa high quality assurance rate. This paper summarizes the key points of the whole construction process of the longitudinal rb composite shearwall.
关键词:装配式结构;纵肋叠合剪力墙;施工工艺要点
Key words: fabricated eonstruetion; longitudinal rb superimposed shear wall; key points of construction technology
|