Construction Technology Key Points and Improvement Measures of U-shaped Beam
钱栋栋①QIAN Dong-dong;张元师②ZHANG Yuan-shi;彭文③PENG Wen
①中车智能交通工程技术有限公司,北京100078;
②中国铁路沈阳局集团有限公司工电检测所,沈阳110001;
③江苏中车城市发展有限公司,无锡214104)
①CRRC ITET Co.,Ltd., Beijing 100078,China ;
②Industrial and Electrical Inspection Institute of Shenyang Railway Administration ,Shenyang 110001, China;
③Jiangsu CRRC Urban Development Co.,Ltd.,Wuxi 214104,China )
摘要:本文针对U型梁施工过程,对钢筋绑扎、预应力张拉,混凝土浇筑、蒸汽养护、脱模、钢绞线放张、起吊等环节存在的问题进行了研究,分析问题产生的原因,提出了相应的改进措施,保障了梁体的施工质量。
Abstract This article focuses on the problems existing in the construction process of U-shaped beams, such as steel bar binding,pre-strss tensioning, concrete pouring, steam curing.demolding, steel strand tensioning, and lifting. The reasons for the problems are analyzed.and corresponding improvement measures are proposed to ensure the construction quality of the beam body.
关键词:“U”型梁;钢筋绑扎;张拉;混凝土浇筑;养护;脱膜
Key words: U-shaped beam; steel bar binding; tension of prestress; pouring concrete; concrete curing; demoulding
|