Research on the Technology of High Pier and Long Span Prestressed Cap Beam Support System for Mountain Expressway
侯军HOU Jun
(中铁十四局集团第三工程有限公司,济南250000 )
( China Railway 14th Bureau Group No.3 Engineering Company Limited,Ji nan 250000,China)
摘要:大跨度高墩预应力盖梁施工支撑难度大,施加预应力技术要求高。本文结合莆炎高速公路承福亭1号大桥高墩大跨度预应力盖梁工程实践,从支架方案选择、施工工艺等方面对大跨度预应力盖梁施工技术进行探讨,取得了良好的施工效果,对类似工程具有一定的借鉴意义。
Abstract: The construction of high pier and long-span prestressed capping beam is dificult to suppot, and the technical requirementof prestressing is high.Combined with the engineering practice of high pier and large span prestressed capping beam of No. l Bridge inChenghuting of Puyan Expressway, the construction technology of large span prestressed capping beam is discussed from the selection ofsupport scheme and construction technology, etc.Good construction effect has been obtainedl, which has certain reference significance tosimilar projects.
关键词:高墩;大跨度;预应力盖梁
Key words: high pier; large span; prestressed capping beam
|