Research on Construction Technology of a Steel Wharf and the Underwater Pile Foundation
李小湘 LI Xiao-xiang
(广东冠粤路桥有限公司,广州 511400)
(Guangdong Guanyue Road and Bridge Co.,Ltd.,Guangzhou 511400,China)
摘要:研究旨在通过深入分析施工过程中的关键环节,寻求提高施工效率、保障工程质量和降低施工成本的方法。通过对钢栈桥及水中桩基础施工技术的研究,提出创新性的施工方案和技术手段,以实现工程施工的高效、安全和可持续发展。结果显示,采用钢栈桥结合钢平台施工水中桥梁桩基、墩柱、盖梁的方法安全可靠,多墩平行作业,各班组流水作业,提高了施工功效,大大缩短了施工工期,节约了施工成本。研究成果为钢栈桥及水中桩基础施工技术的改进提供了有益参考和借鉴。
Abstract: The research aims to seek methods to improve construction efficiency, ensure project quality, and reduce construction costs through in-depth analysis of key links in the construction process. Through research on the construction technology of steel wharf and underwater pile foundation, innovative construction plans and technical means are proposed to achieve efficient, safe, and sustainable development of engineering construction. The results show that the method of using a steel wharf combined with a steel platform to construct the pile foundation, pier column, and cover beam of underwater bridges is safe and reliable. Multiple piers are operated in parallel, and each team operates in a streamlined manner, which improves the construction efficiency, greatly shortens the construction period, and saves construction costs. The research results provide useful references and inspirations for the improvement of construction technology of steel wharf and underwater pile foundation.
关键词:钢栈桥;水中;桩基础;施工技术
Abstract: steel wharf;in the water;pile foundation;construction technique
中图分类号: U445.55+1 文献标识码:A 文章编号:1006-4311(2024)25-054-04 doi:10.3969/j.issn.1006-4311.2024.25.016
|