价值应用
大赛溪支流埋管段二维充水数值模拟研究

Numerical Simulation of Two-dimensional Water Filling in Buried Pipe Section of Dasaixi Tributary
连晨辉① LIAN Chen-hui;张润龙②③ ZHANG Run-long
(①浙江省龙泉市水利局水利发展服务中心,龙泉 323700;②于华北水利水电大学能源与动力工程学院,郑州 450045;③浙江水利水电学院水科学研究院,杭州 310018)
(①Water Conservancy Development Service Center,Longquan Water Resources Bureau,Longquan 323700,China;②School of Energy and Power Engineering,North China University of Water Resources and Electric Power,Zhengzhou 450045,China;③Institute of Water Science,Zhejiang University of Water Resources and Electric Power,Hangzhou 310018,China)


摘要:地下埋管是引调水工程中一种常见的施工方案。瑞垟引水一期工程管线经过大赛溪支流段时,采用地下埋管方案,埋管段管线高程起伏大、水力学条件复杂,充水过程中因水流冲击气团可能诱发滞气爆管。基于水动力学理论,建立了含空气阀的埋管段充水过程二维 CFD 水力数值分析模型,计算分析了典型工况下输水管道充水过程中的关键点位的压力瞬时动态变化和管段流态变化,验证了现有充水方案的安全性。
Abstract: The underground buried pipes are a common construction method in water diversion projects. When the pipeline of the Ruiyang Water Diversion Phase I Project passes through the tributary section of the Dasaixi, an underground buried pipe scheme is adopted. The elevation of the buried pipe section fluctuates greatly and the hydraulic conditions are complex. During the water filling process, the impact of water flow on air masses may induce gas stagnation and pipe bursting. Based on the theory of hydrodynamics, a two-dimensional CFD hydraulic numerical analysis model for the water filling process of buried pipe sections with air valves was established. The instantaneous dynamic pressure changes at key points and the flow state changes of the pipe section during the water filling process of the water transmission pipeline under typical working conditions were calculated and analyzed, and the safety of the existing water filling scheme was verified.
关键词:埋管;充水;排气;数值模拟
Key words: bury the pipe;fill with water;venting;numerical simulation
中图分类号:TV67   文献标识码:A   文章编号:1006-4311(2024)27-124-04    doi:10.3969/j.issn.1006-4311.2024.27.036

社址:石家庄市槐安西路88号卓达玫瑰园物业楼 050091    电话:18132119945    微信:15132496582

投稿邮箱:vezzs02@163.com

价值工程杂志社

点击这里给我发消息      点击这里给我发消息

备案号:冀ICP备19020820号-1     技术支持:新钥匙建站

我要啦免费统计
点击这里给我发消息
点击这里给我发消息
24小时热线: 18132119945